🇺🇸 We ship from the US to US addresses only

Free US shipping on orders $149+

Rio Grande Games  |  SKU: RIO479

Power Grid: Québec/Baden-Württemberg

$14.95
Shipping calculated at checkout.
Free US shipping from $149Usually ships in 3 business days

Pickup available at BoardGameBliss Buffalo

Usually ready in 24 hours

Delivery and Shipping

We ship from Buffalo, NY to the 48 mainland states and Washington, DC. Standard shipping is $12.95 to East and Central states and $19.95 to western states, and free on orders of $149 or more. We aim to ship in-stock orders within 3 business days, and delivery usually takes 3 to 7 business days after that.

For more details, please refer to our shipping and delivery details.

Game details

  • Friedemann Friese Designer
  • 2–6 PlayersBest: 5
  • 120 min Play time
  • 13 and up Age
  • ★ 7.8/ 10 BGG rating
Complexity Heavier · 3.1 / 5
Game data from BoardGameGeek (opens in a new tab)


The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.

In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.

In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.

Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.

Incorporates maps from:

Mégawatts
Funkenschlag: EnBW

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

More by Friedemann Friese

Same designer — often a different theme or play style